Destination Church
Location: Saraland, Alabama
Developer: Destination Church
Category:
WORSHIP CENTERS
Project Description:
The Destination Church, located in Saraland, Alabama, consists of the ground-up construction of a 30,586 SF Sanctuary Building along with associated infrastructures located on the church’s campus. Inside the single-level, portico entrance building is a large worship center with multi-level seating, children’s daycare rooms, and a coffee shop. Along with the configuration of the Sanctuary Building is the construction of sidewalks, landscaping, and a 512-space parking lot.